Turnkey construction and installation of clean rooms

SVS-ARTA can design and build a new freestanding modular cleanroom, adapt your site for the installation of cleanrooms, or even upgrade the cleanroom to join the existing infrastructure.

CONSTRUCTION AND INSTALLATION OF CLEAN ROOMS

CONSTRUCTION OF CLEAN ROOMS IS A COMPLEX TECHNOLOGICAL PROCESS REQUIRING CAPITAL INVESTMENT, TIME AND PROFESSIONALISM.


Engineering company SVS-ARTA (Ukraine, Cherkasy) carries out a range of works on the clean rooms development and implementation: from project development to commissioning with subsequent technical support. Over 15 years of hard work, the company has gained professional experience that allows you to avoid mistakes in the process of operating clean rooms. More than 80 successful projects are an indicator of the quality  performed in strict accordance with the project plan.

In the process of preparation, the features of the objects and the scope of their application are taken into account, the volumes are determined, the investment estimate is calculated and the time of the project implementation is negotiated. The company realizes that the construction of turnkey cleanrooms requires considerable financial costs, therefore it does not impose expensive materials and unnecessary services on the customer. We build only where it is really needed, taking into account the required cleanliness class in a specific room.

воздуховоды вентиляция чистые помещения

фармацевтическое производство корпорации юрия фарм

If you need to upgrade your cleanroom to reach new standards or comply with a more stringent cleanroom classification, SVS-ARTA can help you modify your space. We have a thorough understanding of what’s needed at each class level, and can identify effective ways to improve your class rating while maintaining efficiency.

This could include things like adding FFUs, upgrading your HVAC system (Heating, ventilation, and air conditioning), changing your airflow pattern, or increasing the capacity of your filtration system. We’ll make sure your cleanroom meets all requirements so you can stay focused on your goals. If you want to make sure your space is always up to your cleanroom classification standards, SVS-ARTA can add you to our regular maintenance schedule for cleanroom HVAC service, filter replacement, deep cleaning and more.

THE CLEANROOM CONSTRUCTION STAGES

Cleanroom construction requires particulate control well in advance of the final startup and certification of any cleanroom construction or renovation project. Cleanroom protocols must be followed for the various stages of cleanroom construction, from the receipt of materials to the initial preparation of the cleanroom construction area.


ремонт чистых зон

Conventional construction


After the completion of a detailed analysis of the project, it proceeds to the construction stage, at which facilities, engineering networks and equipment are being erected. At this stage, standard methods of managing the construction of facilities, utilities and equipment are used.

  •  Insulation before construction
  •  Sanitary floor drain systems
  •  Receipt and verification of materials
  •  Wall systems
  •  Floor systems
воздухоотводы вентиляция климат

Clean construction


A clean zone construction area will be designated as such with barrier walls and positive or negative pressure devices deployed to prevent any contamination from entering the designated clean zone construction zones.

  •  Mechanical HVAC Distribution Systems
  •  Electrical Distribution Systems
  •  Process Piping Systems
монтаж потолков чистых помещений

Pre-construction of clean rooms


Entry and exit to the work site through the “cockpit” with air locks and air cleaners. HEPA filters should be installed to reduce dust build-up from cutting and drilling.

  • Flooring Systems
  • Cleanroom Control and Monitoring Systems
  • Cleanroom Systems Integrity Validation
чистые помещения и коридор после ремонта

Active construction of clean rooms


This is the most restrictive stage. Workers entering the cleanroom must wear overalls or lab coats, boots, safety nets and gloves. We use an air circulation system to continuously clean the air.

  •  Installation of technological equipment
  •  Validation, attestation and certification of clean rooms
  •  Installation of technological equipment

Articles


Qualification of rooms

Qualification of rooms

31.08.2022

Basic requirements for clean rooms in pharmaceutical production Cleanroom requirements for aseptic pharmaceutical and terminally sterilized pharmaceuticals differ. The filling / filling process (critical process) in the production of non-terminally sterilized pharmaceuticals requires a clean area “A” surrounded by a clean area of class “B” to minimize the risk of contamination of the finished product […]

Clean rooms for medicine

Clean rooms for medicine

31.08.2022

MEDICAL CLEANROOMS Medical cleanrooms are vital for the work of finding medical solutions, developing vaccines and treatments through pharmacological products, and manufacturing life-saving medical devices. Three main types of medical cleanrooms are medical research cleanrooms, medical device cleanrooms, and pharmaceutical cleanrooms. The cleanroom design for each type will differ depending on the goals of the […]

Our projects


RESORT MEDICAL PARK – clinic in Bukovel

RESORT MEDICAL PARK – clinic in Bukovel

RESORT MEDICAL PARK – a modern clinic in which a block with two operating rooms was built.  

COMPANY

Лого_новый

Engineering company "SVS-ARTA" specializes in the construction and installation of cleanrooms.